Lianjiang Northwest Economic Zone Supporting Infrastructure Facilities Project
项目概述:拟建园区主干道次干道及支路计8条,总公里数约27公里。建设日供2.5万吨规模自来水厂1条,一座规模为5万m3/日污水处理厂。建设110KV变电站1座,按防洪标准20年一遇,排涝标准10年一遇整治建设河道溪流7条,平整场地7500亩等。 Project overview: In total, 8 main and secondary roads and branch roads are planned to be constructed with a total length of about 27 kilometers. One tap water plant with daily supply of 25,000 tons and one sewage processing plant with daily capacity of 50,000 cubic meters will be built. One 110KV transformer substation will be built. 7 rivers and creeks have been treated and controlled by following the flood prevention standard of occurrence of every 20 years and the flood drainage standard of occurrence of every 10 years. 7,500 mu land was leveled. 优势条件:位于连江县西北部、省会福州“半小时经济圈”内,104国道、罗长高速在规划区内东侧穿过,紧邻规划中的福州东绕城高速公路飞石互通口,离长乐国际机场40分车程,具有十分便捷的交通条件与良好的区位优势。园区已入驻省武警总队应急训练救援基地、国家救灾物资储备中心、民政厅综合项目、海西国际现代农产品物流园、东郊粮库、禾福油库项目及武警边防大队训练基地等7个项目。 Advantages: The project is located in the northwestern part of Lianjiang County within the half-hour economic circle of Fuzhou. National Road 104 and Luoyuan-Changle Highway run through the planned area in the east. It is closely adjacent to Feishi interflow access to Fuzhou’s East Belt Highway. It takes 40 minutes to drive to Changle International Airport. Thanks to these, the project enjoys very convenient transportation conditions and favorable location advantages. So far, 7 projects have entered the Zone, i.e. the Emergency Training Rescue Base of Fujian Provincial Armed Police Corps, National Disaster Relief Material Reserve Center, Comprehensive projects of civil affairs department, Haixi International Modern Agricultural Product Logistics Park, Dong Suburb Grain Depot, Hefu Oil Depot Project and Armed Police and Frontier Defense Unit Training Base 项目总投资:15亿元 Total project investment: CNY 1.5 billion 合作方式:独资或合资。 Way of cooperation: sole proprietorship or join venture 项目联络单位:连江西北经济基础配套设施建设指挥部 Project contact unit: Lianjiang Northwest Economic Zone Supporting Infrastructure Facilities Construction Commanding Office 项目联系人:叶万斌 Project contact person: Ye Wanbin 联系电话:62998883 Telephone: 62998883 |